Activity Log

I have decided to include the things I do here along with the day so you guys can see what I am doing. Newest entries are at the top.

August 8th, 2016

August 7th, 2016

  • Sharpened plane
  • Test-planed some wood 
  • Melted some lead



August 6th, 2016

  • Sharpened chisels 
  • Installed pegboard 



June 27th-August 5th, 2016 (Vacation in USA)

  • Replaced kitchen flooring 
  • Refinished dining table
  • Fixed weatherstripping on garage door
  • Cleaned out air conditioner intake  
  • Repainted trim around doors 
  • Tested the spontaneous combustion of linseed oil 
  • Installed motion detection lights 
  • Painted mailbox 



June 26th, 2016

  • Made a bench hook
  • Purchased some wood paint and dimensional lumber 

June 25th, 2016

  • Added support struts to workbench 
  • Purchased some cherry and walnut wood 

June 24th, 2016

  • Practiced making dovetails 

June 22nd, 2016

  • Adjusted a jack plane 
  • Sharpened chisels 
  • Tested flammability of methanol-gasoline mixture verses pure gasoline 

June 21st, 2016

  • Tested the dangers of sodium hydroxide drain cleaner

June 20th, 2016

  • Identified the presence of sodium nitrate in drain cleaner

June 19th, 2016

  • Integrated new shelving/drawer system 
  • Repackaged some chemicals 

June 18th, 2016

  • Final assembly of shelving 
  • Sanding of drawer sides because I made one drawer too big 

June 17th, 2016

  • Glue-up of one of the drawers
  • Glue-up of shelving support 
  • Glue-up of drawer front

June 16th, 2016

  • Cut a dado to fit bottom panel
  • Cut out of bottoms and fronts of drawers

June 15th, 2016

  • Cut sides of drawer system
  • Cut drawer sides

June 14th, 2016

  • Planned out dimensions of drawer

June 13th, 2016

  • Major lab reorganisation

June 12th, 2016

  • Tested the melting point of gold 

June 11th, 2016

  • Created labels for some of my chemicals 
June 10th, 2016
  • Cleaned lab
  • Bottled barium chlorate

June 9th, 2016
  • Synthesized barium chlorate

June 8th, 2016
  • Created vacuum gauge system 

June 7th, 2016
  • Repackaged some solvents 
  • Created labels for solvent cans 

June 5th, 2016
  • Cleaned fume hood sash 
  • Cleaned hotplate
  • Distilled another 3 cans of contact cleaner

June 4th, 2016
  • Distilled 3 cans of electronic contact cleaner for hexane
  • Tested for presence of TCCA in disinfectant tablets 
June 2nd, 2016
  • Cleaned lab
  • Took apart vacuum pump for cleaning and replaced the oil inside 
  • Spread apart some drying neodymium sulfate 

No comments:

Post a Comment