August 8th, 2016
August 7th, 2016
- Sharpened plane
- Test-planed some wood
- Melted some lead

August 6th, 2016
- Sharpened chisels
- Installed pegboard

June 27th-August 5th, 2016 (Vacation in USA)
- Replaced kitchen flooring
- Refinished dining table
- Fixed weatherstripping on garage door
- Cleaned out air conditioner intake
- Repainted trim around doors
- Tested the spontaneous combustion of linseed oil
- Installed motion detection lights
- Painted mailbox
June 26th, 2016
- Made a bench hook
- Purchased some wood paint and dimensional lumber
June 25th, 2016
- Added support struts to workbench
- Purchased some cherry and walnut wood
June 24th, 2016
- Practiced making dovetails
June 22nd, 2016
- Adjusted a jack plane
- Sharpened chisels
- Tested flammability of methanol-gasoline mixture verses pure gasoline
June 21st, 2016
- Tested the dangers of sodium hydroxide drain cleaner
June 20th, 2016
- Identified the presence of sodium nitrate in drain cleaner
June 19th, 2016
- Integrated new shelving/drawer system
- Repackaged some chemicals
June 18th, 2016
- Final assembly of shelving
- Sanding of drawer sides because I made one drawer too big

June 17th, 2016
- Glue-up of one of the drawers
- Glue-up of shelving support
- Glue-up of drawer front

June 16th, 2016
- Cut a dado to fit bottom panel
- Cut out of bottoms and fronts of drawers

June 15th, 2016
- Cut sides of drawer system
- Cut drawer sides

June 14th, 2016
- Planned out dimensions of drawer
June 13th, 2016
- Major lab reorganisation
- Tested the melting point of gold
June 11th, 2016
- Created labels for some of my chemicals
- Cleaned lab
- Bottled barium chlorate
June 9th, 2016
- Synthesized barium chlorate
- Created vacuum gauge system
June 7th, 2016
- Repackaged some solvents
- Created labels for solvent cans

June 5th, 2016
- Cleaned fume hood sash
- Cleaned hotplate
- Distilled another 3 cans of contact cleaner

June 4th, 2016
- Distilled 3 cans of electronic contact cleaner for hexane
- Tested for presence of TCCA in disinfectant tablets
- Cleaned lab
- Took apart vacuum pump for cleaning and replaced the oil inside
- Spread apart some drying neodymium sulfate
No comments:
Post a Comment